search



Corporate Information

 
Press Release (Aug 13,2012)
Report on the APD Misuse by TEPCO Subcontractor at Fukushima Daiichi Nuclear Power Station to the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry

On July 24, 2012, we received a directive document* "Possibility of APD misuse by TEPCO subcontractor at Fukushima Daiichi Nuclear Power Station (Direction)" NISA.

(Previously announced on July 24, 2012)

In accordance with the directive document, we have investigated on the APD misuse by our subcontractor at Fukushima Daiichi Nuclear Power Station (such as evaluating the impact of putting lead cover on APD on the radiation dose reduction and radiation dose control), and submitted a summarized report (including recurrence prevention measures) to NISA today.

Attachment
"Radiation Control Measures to be Implemented in Response to the Possibility of APD Misuse by TEPCO Subcontractor at Fukushima Daiichi Nuclear Power Station"(PDF 501KB)

*Directive document
"Possibility of APD misuse by TEPCO subcontractor at Fukushima Daiichi Nuclear Power Station (Direction)"
(July 24, 2012 NISA No.5)

The aforementioned documents are available only in Japanese. We apologize for the inconvenience this may cause.

back to page top


to TOP