We are announcing the status of major inspections and restoration works and
nonconformances at TEPCO's Kashiwazaki-Kariwa Nuclear Power Station after
the Niigata-Chuetsu-Oki Earthquake.
1. Inspection/Restoration Status
○ Inspection and restoration completed between February 1st to February 7th, 2008.
(Completed on the following date)
• Unit No.1 Fuel and control rod inspection (control rod racks):
February 5th
• Unit No.3 In-core inspection (Phase1 and 2):
February 5th
• Unit No.4 In-core inspection (Phase3):
February 5th
○ Inspection and restoration to be commenced between February 8th to February 14th,
2008
(To be commenced on the following date)
• Unit No.2 Main transformer inspection (preparation for transportation
into the factory):
February 12th
• Unit No. 3 Preparation for restoration work of oil protection bank for
the transformer:
February 12th
• Unit No.5 Fuel and control rod inspection:
February 14th
• Unit No.5 House transformer 5A inspection (oil extraction and preparation
for internal inspection):
February 11th
• Unit No.6 500kV power cable (OF cable) inspection:
February 9th
• Unit No.6 Pressure suppression chamber inspection:
February 7th *
• Unit No.7 Pressure suppression chamber inspection:
February 7th *
* Work schedules added this week
○ Work Schedule of Major Inspection/Restoration from February 4th to March 1st,
2008
• Work Schedule of the Main Inspection/Restoration of the Kashiwazaki-Kariwa
Nuclear Power Station in Response to the Niigata-Chuetsu-Oki Earthquake
(during 4 Weeks) ....Appendix
2. Nonconformances Found in the Inspection and Restoration Works Performed after
the Niigata-Chuetsu-Oki Earthquake
Based on the "Public Announcement Regarding Nonconformance Found in the Inspection
and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake", the Tokyo
Electric Power Company, Incorporated (TEPCO) provides this announcement containing
incidents information reported from January 31st to February 6th, 2008.
○ Incidents Information (relating to the Chuetsu-Oki Earthquake)
 |
<Reports from Jan. 31 to Feb. 6, 2008>
 |
○ Other Findings
• Unit No.2:
During a visual inspection of fuels in spent fuel pool using fiberscopes,
5 pieces of metallic material (with a maximum length of about 10mm and
a diameter of about 0.2mm) were found in the spacer of one of the fuel
bundles by January 15th, 2008.
As a result of the inspection of fuels, no abnormally was found.
(The inspection of the fuel assembly was completed on February 1st, 2008.)
• Unit No.7:
During a visual inspection of fuels in spent fuel pool using fiberscopes,
a piece of metallic material (in spirals, with a maximum length of about
40mm and a diameter of about 0.2mm) were found in the spacer of one of
the fuel bundles on February 6th, 2008.
 Appendix: Work Schedule of the Main Inspection/Restoration of the Kashiwazaki-Kariwa Nuclear
Power Station in Response to the Niigata-Chuetsu-Oki Earthquake (during 4 Weeks)
(PDF 177KB)
|